Home/Services
Specialist Engineering Services

Logistics & Planning Support Across The Development Lifecycle

From early planning, swept path simulations, and statutory condition discharge to contractor tender winning and live construction logistics.

Service 01 · Core Specialist Service

Planning & Technical Support

Statutory Compliance Without Programme Disruption

Kayon Designs produces clear, authoritative construction management and environmental documentation tailored to local borough guidelines, TfL standards, and regional highway frameworks. We translate technical planning conditions into workable site guidelines that secure approvals quickly and protect the build programme.

Key Deliverables & Technical Outputs

Construction Management Plans (CMP)
Construction Logistics Plans (CLP - Outline, Detailed, Final)
Construction Traffic Management Plans (CTMP)
Construction Environmental Management Plans (CEMP)
Materials Management Plans (MMP)
Site Waste Management Plans (SWMP)
Servicing & Delivery Management Plans (DMP)
Planning Condition Discharge Submissions & Comment Resolution Matrices

Common Application Scenarios

  • Discharging pre-commencement planning conditions before starting on site
  • Urban schemes with strict working hours, noise thresholds, and neighbour sensitivities
  • Complex multi-phase developments requiring dynamic phased CLPs

Direct Client Benefits

•Over 90% first-time approval rate on relevant planning submissions
•Satisfies statutory requirements without constraining site logistics or procurement
•Direct, proactive dialogue with borough planning and highway officers
•Fast turnaround for urgent pre-commencement condition discharge milestones

Statutory Frameworks & Guidelines

TfL Construction Logistics Planning GuidanceLondon Mayor Transport Strategy & Vision ZeroBorough Code of Construction Practice (CoCP)Considerate Constructors Scheme (CCS) Alignment
Service 02 · AutoCAD Simulation

Access, Traffic & Vehicle Movement

Solving Constrained Urban Interfaces

A primary stumbling block on urban developments is proving to highway authorities that construction vehicles can access, turn, deliver, and depart safely without endangering pedestrians, cyclists, or creating congestion on strategic road corridors. Kayon Designs provides rigorous computer-simulated swept path analysis and access designs.

Key Deliverables & Technical Outputs

Swept Path Analysis (SPA) & Computer Vehicle Tracking
Site Access & Egress Strategies with Phased Gate Layouts
Delivery Routing Plans & TfL Strategic Road Network Coordination
Traffic Management & Temporary Highway Works Plans
Pedestrian Management & Vulnerable Road User (VRU) Protection
Highway Licences, Bay Suspensions, Hoarding & Gantry Documentation
Pit-lane Logistics Design & Multi-Gate Servicing Strategies

Common Application Scenarios

  • Narrow city streets with restricted turning radii and tight site boundaries
  • Developments adjoining TfL bus lanes, cycle superhighways, or pedestrian crossings
  • Planning and licensing pit-lane operations on the live public highway

Direct Client Benefits

•Precise turning envelopes for rigid tippers, articulated flatbeds, and low-loaders
•Mitigates safety risks for cyclists and pedestrians along busy urban streets
•Optimises on-site staging and holding areas, avoiding street queues and fines
•Conforms to London Cycle Superhighway and Red Route highway restrictions

Statutory Frameworks & Guidelines

Design Manual for Roads and Bridges (DMRB)TfL Streetscape GuidanceChapter 8 Traffic Signs ManualDirect Vision Standard (DVS) for Heavy Goods Vehicles
Service 03 · Work Winning Edge

Tender & Pre-Construction Support

Winning Bids & Protecting Delivery Viability

Securing high scores on competitive contractor tenders and establishing developer project feasibility demands credible logistics methodology. We model vehicle demand profiles, crane hook time, hoist allocations, gate movements, and temporary works phasing to give clients an unbeatable technical advantage.

Key Deliverables & Technical Outputs

Review of site access, highway, neighbour, and operational constraints
Credible delivery strategies aligned to substructure and superstructure sequencing
Compelling technical responses, narratives, and diagrams for tender submissions
Capacity testing for gates, hoists, tower cranes, welfare, and material staging
Forecasts of logistics demand, vehicle trip generations, and peak traffic hours
Early coordination of logistics constraints back into structural engineering design

Common Application Scenarios

  • Main contractors bidding for complex central London commercial or institutional projects
  • Developers preparing early-stage feasibility and RIBA Stage 2-3 constructability reviews
  • Tenders requiring detailed logistics phasing diagrams and vehicle booking systems

Direct Client Benefits

•High-scoring technical tender submissions that win client trust and awards
•Accurate site establishment models preventing costly post-award variations
•Early identification and mitigation of boundary, crane over-sailing, and highway risks
•Confidence for funders and investors in project deliverability

Statutory Frameworks & Guidelines

CIOB Code of Practice for Project ManagementBREEAM Construction Stage Logistics CreditsConstruction (Design and Management) Regulations (CDM 2015)
Service 04 · On-Demand Advisory

Delivery Support & Associate Consultancy

Agile Embedded Capability When You Need It

When projects encounter unexpected site constraints, sequence changes, revised delivery gates, or council enforcement queries, Kayon Designs provides rapid-response technical reviews and practical solutions. We act as an extension of your project management team or provide confidential white-label capability.

Key Deliverables & Technical Outputs

Live Logistics Audits & Strategy Alignment Reviews
Phased Site Establishment Layout Reconfigurations
Multi-Gate Balancing & Live Pit-Lane Operational Protocols
Borough Highway Enforcement & TfL Liaison Support
On-site Vehicle Routing Verification & Driver Logistics Briefs
White-Label Technical Support for Consultancies and Project Managers

Common Application Scenarios

  • Responding immediately to council highway queries or non-compliance notices
  • Switching between substructure and fit-out logistics phases seamlessly
  • Engineering firms requiring specialized construction logistics capacity on demand

Direct Client Benefits

•Zero programme stoppage during live site reconfigurations or highway changes
•Direct founder involvement for sensitive authority negotiations
•Flexible commercial terms: fixed-fee, day-rate, or associate retainer
•Scales project management capacity without ongoing permanent headcount

Statutory Frameworks & Guidelines

FORS (Fleet Operator Recognition Scheme) Silver/Gold StandardsCLOCS (Construction Logistics and Community Safety) StandardSection 278 / Section 184 Highways Act Agreements
Our Work Process

How We Deliver Every Commission

From initial site constraint review to full planning authority condition discharge.

01

Initial Consultation & Constraint Review

We review your site plan, planning conditions, borough policies, and key vehicle requirements.

02

Technical Testing & Swept Path Simulation

AutoCAD vehicle tracking verifies physical feasibility of access, turning, and crane envelopes.

03

Draft Documentation & Client Review

We prepare clear, buildable CMPs, CLPs, or tender packages with clear diagrams for client review.

04

Authority Submission & Condition Discharge

We engage directly with planning and highway officers, resolving comments to secure approval.

Need a Construction Logistics Plan or Swept Path Analysis?

Speak Directly With Senior Consultant Kaysar Alim

We provide fixed-fee quotes within 24 hours. Send us your site drawings and planning conditions for an immediate appraisal.